Commercial Projects

Zenith Tower Refurbishment

Client: Centuria | Size: 14 Floors | Program: 30 weeks

Raguz Building Services achieved a stylish upgrade for the common areas of a premier Chatswood office building. The formerly uninviting dark lobby areas have been transformed with the introduction of directory boards, recessed glazing and stylish new shopfronts.

This modern and well-lit space acts as a follow through to the sophisticated offices located beyond the shopfronts. With minimum interference to the business life on each floor our team was able to complete the upgrade to the expected satisfaction of all parties involved.

slide 1
Image Slide 1
Image Slide 2
Image Slide 3
previous arrowprevious arrow
next arrownext arrow
Shadow

Security Vault

Client: ABC Bullion | Size: 500sqm | Program: 26 weeks

This project involved a complete refurbishment of ABC Bullion.  The latest standards for a high security facility were constructed which involved the installation of bullet proof doors and security access control.  The project was successfully completed within a strict time frame during the Christmas and the New Year’s period.

slide 1
Image Slide 2
image061
zetlands4
previous arrowprevious arrow
next arrownext arrow
Shadow

Macquarie Ice Rink

Client: AMP | Size: 1,500sqm | Program: 20 weeks

As the Macquarie Ice Rink had to remain operational during the entirety of the refurbishment, this was a challenging project as much of the work needed to be completed at night, outside of normal trading hours.

This project gave the ageing ice rink a new face-lift and was completed on time and on budget, ready for a scheduled international hockey game.

slide 1
Image Slide 2
DSC_1184
zetlands4
DSC_1243
previous arrowprevious arrow
next arrownext arrow
Shadow

Zenith Tower L18A

Client: The Zenith | Size: 500sqm | Program: 6 weeks

In collaboration with our in-house design team, RBS facilitated this outstanding modern fit out.
Attention was given to incorporate in the necessary facilities for a 500sqm office space!
slide 1
Image Slide 1
DSC05629
Image Slide 2
Image Slide 3
WhatsApp Image 2021-06-01 at 13.48.12
previous arrowprevious arrow
next arrownext arrow
Shadow

Zenith Towers Amenities Upgrade

Client: Centuria | Program: 6 weeks

Upgrade of common bathroom facilities on occupied floors.
Brief: With minimal disturbance to the tenants on 9 floors. RBS managed and facilitated the upgrade of 9 floors of bathrooms in the given time for handover.
slide 1
Image Slide 3
Image Slide 1
Image Slide 2
previous arrowprevious arrow
next arrownext arrow
Shadow

We’ve worked on countless commercial projects. Talk to our experienced, efficient and motivated team to help create the perfect space for your business.